1 Thermal transfer machine operating procedures 1

The operator of this machine must undergo professional training and understand and be familiar with the operation of the machine, including the sequence of operating steps, the location and function of each switch and button, the readings and meanings of each instrument, etc. It is forbidden for unrelated personnel to operate the machine or direct others to operate the machine.

2 Thermal transfer machine operating procedures 2
Before starting the machine, you should first check the stability of the machine, ensure that the work surface is in a horizontal state (this can be achieved by adjusting and tightening the support screws of the machine), and confirm whether the machine parts such as rubber rollers, film racks, and electric furnaces are tightened

3 Thermal transfer machine operating procedures 3
Check the machine's electrical, gas, oil, and grounding interfaces and valves, confirm that there is no leakage or shedding, and that the liquid levels (such as oil level, triple water level, etc.) are normal. The machine can only be turned on when all electrical plug-ins are firm.

4. Operation Procedures of Thermal Transfer Machine IV
Press the power switch and turn on the power of the whole machine. First, set the temperature of the rubber roller to about 100℃, and the rubber roller enters the front section for heating; turn on the air source of the whole machine, set the air pressure between 0.5 and 0.7Mpa, and observe whether the air pressure is normal and stable (once the air pressure is unstable or lower than 0.5Mpa, it is very likely to affect the production quality or cause an accident, and normal production shall not be carried out). After that, adjust the rubber roller to the required hot stamping temperature after the constant temperature, and enter the back section for heating.

5. Operation Procedures of Thermal Transfer Machine V
Adjust or test (including automatic and manual) the mechanical action of the whole machine, including the lifting and lowering of the hot furnace, film rolling, seat feeding, rubber roller rotation and other actions and the coordination with the foot switch, especially test the normal working condition and sensitivity of the emergency stop switch.

6. Operation Procedures of Thermal Transfer Machine VI
After the machine is started and the action test is carried out, if there are still abnormal conditions such as jamming, abnormal noise, leakage, etc., the machine should be stopped for processing, and the equipment is prohibited from running with illness.

7 Heat transfer machine operation procedures 7
The various forms of heat transfer machine (except flat ironing) transfer operation can basically be classified as roller winding operation. It is forbidden to wear strange clothes, hang wrist accessories and let long hair loose to prevent safety accidents caused by the machine winding.

8 Heat transfer machine operation procedures 8
The process of this equipment is characterized by heating and heating. The operation process should be especially prevented from burns, especially the control of the foot switch. If necessary, the foot switch can be moved to the work surface and controlled by hand. If you are accidentally pressed by the rubber roller or electric furnace, you should immediately press the emergency stop button to release it.

9 Heat transfer machine operation procedures 9
If the equipment fails, it must be reported to professional maintenance personnel for maintenance. Non-professionals are prohibited from disassembling or handling it by themselves; the inspection and maintenance of moving parts should be carried out in the shutdown state.

10 Thermal transfer machine operation procedures 10

After get off work or after the operation is completed, shut down the machine, turn off the electric furnace for heating, and ensure that the ironing shaft continues to rotate to ensure that the rubber roller continues to dissipate heat. The heat dissipation time is generally about 60 minutes; when the machine is tested and qualified, the electric furnace cooling delay is set to ensure the safety and service life of the rubber roller; after the rubber roller is cooled, turn off the input main power; if there is a power outage during work, the silicone roller in the electric furnace should be removed in time to prevent the rubber roller from being burned or cracked by the electric furnace for safety reasons.

CATEGORIES

CONTACT US

Name: Edison

Mobile:+86-17669797337

Tel:+86-17669797337

Whatsapp:8617669797337

Email:sales@ulikefilm.com

Add:Dazhuge Industry Park,Jiaozhou City,Qingdao,China

whatsapp

Skype

Email

Phone

QQ